Home About us Milestones
Milestones
2015 Shanghai SEC Technology Co., Ltd. established.
2016 Commissioned Plant A1 at No. 6000 Shenzhuan Highway, Songjiang, Shanghai, launching mass production of wound cores using ultra-thin magnetic steel strips (0.1mm/0.08mm/0.05mm), notably achieving batch production of CD cores.
2017 Deployed China’s first high-speed slitting line, dedicated to “ultra-thin” high-performance magnetic steel strips, initiating magnetic strip slitting & distribution services.
2018 Launched stacked core series with right-angle laminations for specialized reactors and high-speed rail power supplies.
2019 Founded Power Electronics Division. Constructed automotive sensor core workshop compliant with IATF 16949, obtaining LEM supplier certification to enter EV components sector.
2020 Passed ABB China’s supplier audit (industry’s highest standard for transformers), expanding slitting distribution operations.
2022 Established Power Transmission & Distribution Division. Commissioned Workshop A3 for energy-efficient transformer core manufacturing.
2023 Operationalized first self-developed 500cm high-speed cut-to-length line, achieving import substitution. Commenced Hitachi (ABB) global core supply qualification audit.